Modernisation of the Zemo Samgori irrigation scheme in Georgia (East of Tbilisi) to restore irrigation services and provide the basis for agricultural development in the region.
The project aims to modernise infrastructure on up to 25,800 hectares of irrigated land, including investments in the entire water distribution network and facilitating investments in on-farm irrigation equipment. The investment will enable farmers to increase and diversify their agricultural production.
The project will modernize and upgrade existing irrigation schemes, enhancing water resilience in perspective of less upstream water availability and more water requirements because of Climate Change impacts. The restored command area will be 19 129 ha of existing agricultural land. The peak of the system (before collapse) had been of 50 000 ha. In 2021 only 5 320 ha were irrigated.
The project is expected to enable a sustainable increase in agricultural productivity through the water vector, with particular regard to the efficient management of natural resources (arable land, water, fertiliser and other agricultural inputs) achieved through the modernisation measures to existing irrigation infrastructure. This will enable the shift towards an increased and diversified primary production, due to the improvement and expansion of irrigated areas and the crop pattern changes.
The operation is fully in line with the objectives of the European Neighbourhood Policy of the EU and with the Association Agreement between Georgia and the EU. The operation contributes to the policy priorities for the geographic programmes under the NDICI mandate, from which support is sought for the EIB financing. The Project supports notably economic development and market opportunities through agriculture and rural development, aligned with the strategy "Implement the Rural Development Strategy of Georgia 2017-2020" and with "Strategy of Agriculture Development of Georgia for 2012-2022", that foresees as priority (among others) the enhancement of irrigated agriculture through rehabilitation, reconstruction and modernization of old existing irrigation schemes.
The economic viability of the project is rated excellent, as its overall social benefit, due to the significant advantage that the project generates for the overall society. The project will generate sizeable permanent employment opportunities. The project has a high positive impact on the economic resilience of local communities in an area with a great agricultural potential, currently not being realised due to the bad condition of water conveying infrastructure.
This project addresses Market Failures by creating net positive externalities in the fields of water conservation (increase in environmental flow downstream) and climate change resilience (both mitigation and adaptation), expanding sustainable agricultural practices linked to the use of modern irrigation techniques.
The EIB Technical and Financial Contribution to the project is Very Good. This is the result of the financial contribution and facilitation, and the technical advice provided to the project, especially at preparation stage, as well as promoting a holistic approach between public investments (upstream canals) and private contribution (on-farm modern technologies) that aligns water savings, agriculture production improvement and environmental positive impacts.
The EIB contribution is very good. The EIB has provided leadership on the scoping of the project through the Eastern Partnership Technical Assistance Trust Fund grant that was used to finance a feasibility study. The output of this study and its recommendations were used during the appraisal. The project also benefits from longer maturities and grace period.
A comprehensive Environmental and Social Impact Assessment (ESIA), and Environmental and Social Management Plan (ESMP), including a Resettlement Action Plan (RAP) will be prepared in alignment with the EIB's Environmental and Social Standards.
The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Under EFSD+ Guarantee
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes