IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK

Signature(s)

Montant
1 200 000 000 €
Pays
Secteur(s)
Italie : 1 200 000 000 €
Transports : 1 200 000 000 €
Date(s) de signature
18/06/2024 : 400 000 000 €
14/02/2024 : 800 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
26 février 2024
Statut
Référence
Signé | 14/02/2024
20220729
Nom du projet
Promoteur – Intermédiaire financier
IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK
AUTOSTRADE PER L'ITALIA SPA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 1200 million
EUR 2921 million
Lieu
Secteur(s)
Description
Objectifs

The investment programme concerns the modernisation and upgrade of the highway network operated and managed by ASPI, covering a total length of 2,855 km. In particular, it includes the following works: - Seismic upgrading and structural reinforcement of 40 bridges and viaducts (in line with the EU and national standards post Morandi bridge collapse), including the demolition/reconstruction, reinforcement of deck and substructure as well as renewal of crash barriers on bridges and viaducts in line with the EU Standard EN 1317; - Replacement of crash safety and noise barriers, including more than 66,700 linear metres of safety barriers and the installation of more than 85,000 linear metres of new noise barriers; - Alignment of 87 existing tunnel tubes in terms of structural reinforcement (IRS) and renewal interventions (TRS); - Smart and Intelligent Roads; - Modernisation of ASPI's installation, including works to reduce CO2 emissions (energy-efficiency renovation of buildings, replacement of lighting with LED) and upgrade of Intelligent Transport Systems (ITS) to optimise traffic flow and safety; - Modernisation of ASPI's IT infrastructure, including the installation of 871 linear kilometres of fiber optic; - Installation of 98 e-vehicle charging stations across ASPI's highway network including at least 2 ultra-fast DC charging units of 300 kW.

The main objectives are to safeguard and upgrade the assets, to improve road safety, to reduce pollution, notably noise as well as develop ITS services and electric recharging stations. The project is not expected to lead to any traffic capacity increase. Moreover, it is expected that no material interventions will occur beyond the existing right of way.

Additionality and Impact

The proposed operation aims at improving over 40% of the Italian motorway network, a key strategic infrastructure which is almost entirely on the core and comprehensive TEN-T. This network, operated by ASPI, requires to be modernised to meet the latest TEN-T regulations and Italian standards in terms of infrastructure safeguard and road safety on its entire length.

The Project focuses on the following main streams: (i) regulatory adaptation and rehabilitation of viaducts/bridges and tunnels, (ii) replacement of safety barriers, (iii) installation of anti-noise barriers, (iv) upgrade of optic fibre, installation of IT systems for security and network monitoring, lighting and security signage, and (v) installation of e-vehicle charging points.

The Project is expected to lead to a significant set of benefits, including maintenance savings, lower accident rates, abatement of noise pollution and CO2 emissions, and time saving for road users due to smart transport innovation. The project is not aimed at increasing capacity.

The Project is aligned with the EIB's Climate Bank Roadmap and with the provisions of the EIB's Transport Lending Policy on interurban roads.

EIB's technical contribution has been limited to better assess and report the sustainability elements of the project. By doing so, the Bank services have contributed to raise the awareness of the promoter to a more holistic approach to the planning and programming of road rehabilitation, going beyond the economic impact of the project by taking into account its climate, environmental and social aspects.

The EIB financing will stabilize ASPI's funding sources with a longer tenor than otherwise available in the market, with a final maturity date aligned to the concession expiry date in 2038. Moreover, the EIB support to ASPI is expected to mobilize additional financing which will further underpin ASPI's efforts in their capex plan implementation with a strong signal to other lenders and the market regarding the solidity and viability of ASPI's business model, also in light of the upcoming negotiations with the Grantor for the review of the 2025-2029 regulatory period.

Aspects environnementaux
Passation des marchés

None of the project's components are included in the categories of works listed Annexes II, III and IV, as set out in Article 6(6) of the Italian Consolidated Environmental Law (Testo Unico Ambiente - TUA) D.Lgs 152/06 which transposes Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU and therefore are not subject to an EIA procedure. Some of the project components under the category of works "rehabilitation of bridges and viaducts" and "installation of noise barriers" were subject to appropriate assessments (Valutazione di Incidenza VincA) in accordance with article 6.3 of the Habitats directive 92/43/EEC and with the Italian national guidelines on appropriate assessment (2019) . The project contributes to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation, pollution prevention and control.

Today ASPI is a private listed company, belonging to the category of concessionaires which are not contracting authorities. Part of the investments included in the project has been/shall be directly awarded to ASPI's subsidiary companies without public procurement, which does not formally infringe EU legislation within limits. The new Public Contracts Code of Italy (art. 186.2) imposes the obligation for the holders of directly awarded motorway concessions to entrust a quota between 50% and 60% (depending on different criteria included in the Code) of the works, services and supply contracts via public procurement processes. The promoter has therefore been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

Milestone
À l'examen
Approuvé
Signé
13 décembre 2023
14 février 2024
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK
Date de publication
26 Feb 2024
Langue
Sujet général
Prêts
Numéro du document
178268931
Thématique du document
Information Environnementale
Numéro du projet
20220729
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Évaluation des incidences environnementales et sociales - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK - RELAZIONE GENERALE - Viadotto Carafone
Date de publication
28 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
181946763
Thématique du document
Information Environnementale
Numéro du projet
20220729
Secteur(s)
Pays
Disponible au public
Télécharger maintenant
Évaluation des incidences environnementales et sociales - IMPROVEMENT PROGRAMME ITALIAN HIGHWAY NETWORK - RELAZIONE GENERALE - Ponte Enza
Date de publication
28 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
181929769
Thématique du document
Information Environnementale
Numéro du projet
20220729
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes