Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
150 000 000 €
Pays
Secteur(s)
Grèce : 150 000 000 €
Énergie : 150 000 000 €
Date(s) de signature
27/05/2024 : 150 000 000 €
Lien vers la source
Fiche technique

Fiche récapitulative

Date de publication
27 février 2024
Statut
Référence
Signé | 27/05/2024
20230622
Nom du projet
Promoteur – Intermédiaire financier
HEDNO DISTRIBUTION I
HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR SA
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 150 million
EUR 592 million
Lieu
Secteur(s)
  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Description
Objectifs

The project consists of an investment programme in electricity distribution in Greece, covering the period 2024-2026. The programme includes investments in MV and LV networks, smart meters and automation.

The aim is to connect new system users, including renewable energy sources and improve the reliability and quality of electricity supply. Smart meters are expected to reduce non-technical losses, enable remote operations related to end customers, improve demand forecasting, improve awareness on electricity consumption, support energy efficiency policies, enable the implementation of new services such as demand side management, increase observability of the low voltage distribution network, improve quality of service, facilitate the energy market, and contribute to the reduction of various operating costs.

Additionality and Impact

The project is an investment programme in electricity distribution. It covers investments in overhead lines and underground cables, substations, transformers, smart meters, and automation.


The programme comprises the expansion and modernisation of the electricity distribution network of the Promoter, consistently with the country's National Energy and Climate Plan and in alignment with EIB policies. The programme schemes are located in Cohesion Priority Regions. The programme is expected to deliver economic benefits over the financial return, in particular by addressing market failures linked to negative environmental externalities (GHG emissions from power generation) and the supply of public goods (security of power supply).


The expected Economic Rate of Return (ERR) and the broader social benefits of the programme are deemed "very good", reinforced by its contribution to the economic activity in Cohesion Priority Regions.


The Promoter is an experienced operator of electricity distribution networks with a sound project management structure.


The proposed operation meets the required funding needs of the Promoter, by providing an amortising loan with a long tenor and an adequate pre-amortisation period, together with a sizeable financing volume. The EIB loan is expected to further improve the Promoter's maturity profile as well as the diversification of its funding sources.

Aspects environnementaux
Passation des marchés

The programme comprises several electricity distribution schemes with voltages ranging from 0.4 kV up to 20 kV. Some of these schemes may fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. Where, and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. Programme schemes that have to do with smart meters and automation are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's procedures and standards. It will focus on the promoter's capacity to implement the programme in line with the EIB environmental and social standards and requirements.

The promoter has to ensure that contracts for implementation of the programme are tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
À l'examen
Approuvé
Signé
12 avril 2024
27 mai 2024
Lien vers la source
Fiche récapitulative

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - HEDNO DISTRIBUTION I
Date de publication
11 Jun 2024
Langue
Sujet général
Prêts
Numéro du document
179291171
Thématique du document
Information Environnementale
Numéro du projet
20230622
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

À la une

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes