Date de publication: 16 juillet 2014
Promoteur – Intermédiaire Financier
Centre Hospitalier Territorial de Nouvelle CalédonieLieu
Description
The project concerns the construction of a new hospital located in Koutio, city of Dumbea, in the outskirts of Noumea, New Caledonia. It is undertaken in cooperation with the Agence Française de Développement. The project is also be co-financed by the Caisse des Dépôts et Consignations.
Objectifs
The project will improve quantitatively and qualitatively the coverage of the health needs of the population and significantly reduce the number of referrals abroad.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 20 million
Coût total (montant approximatif)
EUR 419 million
Aspects environnementaux
The project is subject to an EIA according to national legislation. The promoter provided the Bank with a copy of the Environmental Impact Statement (EIS), including a non-technical summary (NTS). Confirmation that the scheme does not have a significant negative impact on any site of nature conservation importance will be required. The promoter shall provide the Bank with copies of final environmental permits approving the promoter’s EIA and the evidence that the project fully includes any mitigation or compensation measures that were proposed by the EIS.
Passation des marchés
The promoter will be required to implement the project in accordance with the Bank's Guide to Procurement.
Statut
Signé - 19/12/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).