Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140048
Date de publication: 14 avril 2015

Promoteur – Intermédiaire Financier

SECRETARIA DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS

Lieu

Description

The project consists of the rehabilitation and upgrading of the road sections CA-11 La Entrada – El Florido and CA-4 La Entrada – Santa Rosa de Copán (in total 116 km). Both road sections form part of the Western Corridor of the primary national road network, connecting the second biggest city of the country – San Pedro Sula – to the international border crossings with Guatemala and El Salvador.

Objectifs

The project contributes to the EU's global objective of improving social and economic infrastructure, including road transport, in Latin American countries.

Commentaires

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Secteur(s)

Garantie au titre du MPE

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Montant BEI envisagé (montant approximatif)

EUR 79 million

Coût total (montant approximatif)

EUR 168 million

Aspects environnementaux

The project involves rehabilitation and upgrading works on pre-existing roads, including some limited re-alignment. If the project was located within the EU, it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring screening to determine if EIA is required. A full EIA has been carried out. As part of the Bank's due diligence of the project, compliance with the relevant EU environmental and social principles, standards and practices will be verified. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 11/06/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Honduras Transports