Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150364
Date de publication: 8 octobre 2015

Promoteur – Intermédiaire Financier

TRENITALIA SPA

Lieu

Description

The project consists of the acquisition of rolling stock for regional passenger railway services in the Lazio, Liguria, Veneto, Piedmont and Tuscany regions in Italy. In particular, it consists of the acquisition of 49 five-car articulated electrical multiple units (EMUs) and 250 double-deck passenger coaches.

Objectifs

The project will increase the quality of the services provided by the promoter, and thereby will promote sustainable transport solutions, in line with EU objectives.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 300 million

Coût total (montant approximatif)

EUR 709 million

Aspects environnementaux

The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) as manufacturing and use of rail rolling stock is not included in either list. The need for an EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. The project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market.

Passation des marchés

The promoter is a contracting authority regulated by public procurement law. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 23/12/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Transports