Recherche Fr menu fr ClientConnect

Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150825
Date de publication: 28 juillet 2016

Promoteur – Intermédiaire Financier

Private Company

Lieu

Description

The project is an investment programme that comprises investment schemes in the production and distribution of electricity in Styria, Austria. The electricity generation scheme includes plans to build a 16 MW hydropower plant in the city of Graz and a 39 MW wind farm located in the mountainous region of Deutschlandsberg, together with their grid connection facilities. The electricity distribution part covers extensions and refurbishments of the low- and medium- voltage electricity distribution grid in Styria.

Objectifs

The hydropower and wind power plants in the project will contribute to national and EU renewable energy targets. The network investment programme aims to improve the quality and the reliability of grid infrastructure.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 140 million

Coût total (montant approximatif)

EUR 333 million

Aspects environnementaux

The project is an expansion of a distribution electricity network and construction of a new hydroelectric power generation plant and a wind farm in Styria, Austria. The project falls under Annex II of the EIA Directive 2011/92/EU. Here, the competent authority in line with Austrian environmental law (UVP-G 2000) requested an Environmental Impact Assessment (EIA) including public consultation for a wind farm and hydroelectric power plant. The final environmental permits were granted for both. Electricity distribution at medium and low voltage, are typically implemented with low or insignificant environmental impact. The environmental impact of all the projects will be further appraised.

Passation des marchés

The European Commission has exempted the generation of electricity in Austria from public procurement provisions by Decision 2008/585/EC. The Bank will review the project's procurement procedures to ensure that its funds are used appropriately for the purchase of works, goods and services.

Statut

Signé - 31/03/2017

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Autriche Énergie