    Referenz: 20070023
    Veröffentlichungsdatum: 17 Juli 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    Regione Marche

    Ort

    Beschreibung

    EIB financing will support the Regional Development Programme in three main priority axes:1) Improvement of the competitiveness of the economic fabric (Research and Development capacity, innovative know-how of SMEs and support of SME’s in the tourism and cultural heritage sector); 2) Enhancement of the environment via schemes aimed at increasing energy efficiency, measures in favour of renewable energy, rehabilitation of contaminated zones and valorisation of the natural resources and historical heritage; 3) Development of the accessibility of both transport systems (multi-modal transports and road improvement) as well as information technologies (notably via better IT connections to companies).

    Ziele

    Financing of investments under the Regional Development Programme 2007-2013.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 300 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 800 million.

    Umweltaspekte

    The project encompasses a substantive set of infrastructure schemes, some of which might require an EIA and biodiversity safeguarding procedures according to EU legislation (namely Directive 85/337/EEC as amended by Directive 97/11/EC and 2003/35/EC), depending upon the size and location. More specifically, each of the project schemes will be assessed to determine whether it falls under Annex I or Annex II and, for schemes falling under Annex II, whether an EIA is to be carried out or not and on what basis. Scheme evaluation will include also possible impacts on protected flora and fauna (Habitats and Birds Directives). Finally, project appraisal will address if a Strategic Environmental Assessment has been undertaken in line with "SEA" Directive 2001/42/EC.

    Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA)

    Auftragsvergabe

    The promoter is bound to follow EU public procurement procedures. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC or 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 8/11/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Kombinierte Infrastrukturvorhaben