Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100024
Veröffentlichungsdatum: 10 Mai 2013

Projektträger – zwischengeschaltetes Finanzinstitut

The promoter is one of the largest integrated multi-utilities in Italy.

Ort

Beschreibung

The project concerns the water and wastewater investment programme of the promoter throughout the Emilia Romagna region, in the Padua area (Veneto region) and in the Trieste area (Friuli Venezia-Giulia region).

Ziele

The programme will be aimed at (i) upgrading and extension of wastewater treatment plants (ii) extension and rationalisation of sewer networks, and (iii) extraordinary maintenance of water and sewer networks.The proposed project is expected to result in an improvement of the quality of the water bodies receiving the wastewaters (including the Adriatic Sea) and to contribute towards the rationalisation of wastewater and water supply services at the basin levels.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 300 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 649 million

Umweltaspekte

The project aims primarily at compliance with the EU Urban Waste Water Treatment Directive 91/271/EC as amended by Dir. 98/15/EC and the Water Framework Directive 2000/60/EC. Where any component is subject to the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EC, the Bank will publish the non-technical summary of such EIA on its website. Overall, the project is expected to have a positive environmental impact.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Projektstatus

Unterzeichnet - 30/09/2013

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Wasser, Abwasser