Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100479
Veröffentlichungsdatum: 26 November 2010

Projektträger – zwischengeschaltetes Finanzinstitut

Ministry of Agriculture, Forestry and Water Management of Republika Srpska

Ort

Beschreibung

The project involves inventory of flood damages to flood protection infrastructure within the RS's main Danube tributaries, preparation of a Flood Risk Management and Flood Prevention plan including the identification of short, mid and long term measures and finally implementation of priority works for the remedy, repair and rehabilitation of damaged infrastructure in the most vulnerable areas. Aspects of spatial planning, redevelopment of flood areas and long and mid term flood prevention measures are also included.

Ziele

The project purpose is to safeguard the agriculture, industrial and housing areas prone to flood impacts and to enable a stable future development. The continuous use of agriculture land will be effected and the spatial planning, finally being based on a stable situation of flood protection and prevention, will be able to focus on establishing protection zones and protected areas in accordance with the EC Directives. The project is expected to contribute to a stable and reliable flood protection in RS, protecting the environment and the people, in compliance with the requirements of the EC Flood Directive.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 74 million

Gesamtkosten (voraussichtlicher Betrag)

At least EUR 98 million

Umweltaspekte

The project is environmentally driven. Enhanced protection and prevention levels will reduce contamination of the environment by septic tanks, sewerage, oil spills etc.

Auftragsvergabe

The promoter will have to ensure satisfactory application of the Bank’s Guide to Procurement and relevant EU rules, which will require international tendering, including publication in the OJEC, for large contracts.

Projektstatus

Unterzeichnet - 27/10/2011

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Bosnien und Herzegowina Wasser, Abwasser