Veröffentlichungsdatum: 30 Juli 2012
Projektträger – zwischengeschaltetes Finanzinstitut
ZON OPTIMUS SGPS SAOrt
Beschreibung
Roll-out of a Long Term Evolution (LTE/4G) mobile telecommunications network and upgrade of the UMTS network.
Ziele
The project will enable expansion of coverage and increase of capacity to provide high speed mobile broadband services in Portugal. The access technologies included in the eligible project (UMTS with HSPA+ and LTE/4G) are relevant to fulfil the EU's Digital Agenda target of reaching a coverage above 30 Mbps transmission speed by 2020 across the Union and addressing the expected increase of mobile data (and stationary or slow-moving wireless) traffic volumes.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 110 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 222 million
Umweltaspekte
Investments in telecommunications projects do not fall under Annex I or II of Directive 2011/92/EU. Mobile telecommunications systems have limited environmental effects, apart from the visual impact of base station towers and electromagnetic field radiation. Details will be assessed during appraisal including the CO2 footprint and possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).
Auftragsvergabe
The promoter is a private company not operating in the utilities sector, and is therefore not covered by the EU Directives on procurement.
Projektstatus
Unterzeichnet - 28/11/2013
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).