Veröffentlichungsdatum: 17 Februar 2015
Projektträger – zwischengeschaltetes Finanzinstitut
SEM ENERGIES POSIT'IFOrt
Beschreibung
The project will support the thermal refurbishment of residential buildings and the use of renewable energies in the region of Ile de France
Ziele
The works consist mainly of improving the insulation of the buildings and windows as well as renovation of the heat generation and distribution system in the buildings, ventilation systems, and electric appliances which are part of the joint tenancy area (lights, pumps, etc.). The use of renewable energies (e.g. biomass or solar thermal collectors) may also be included in the works. Individual metering is foreseen in certain cases, for users to monitor their consumption.The works will lead to a decrease in energy consumption of the buildings. The performance level targeted is the "BBC Éffinergie Rénovation" label requirements which would correspond to a 50 - 70 % reduction of overall energy consumption of the buildings.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 100 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 200 million
Umweltaspekte
This operation intends to bring environmental benefits by supporting projects that reduce energy consumption, and help to mitigate climate change. The individual schemes to be financed are likely to be small and are expected to have very limited negative environmental impacts. Given the scale, location and nature of the sub-projects in built-up urban areas, an EIA, as defined under the EIA Directive 2011/92/EU, is not required.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
Unterzeichnet - 7/12/2015
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).