Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150717
Veröffentlichungsdatum: 17 März 2016

Projektträger – zwischengeschaltetes Finanzinstitut

TERRITORIO HISTORICO DE VIZCAYA

Ort

Beschreibung

The operation concerns the financing of water and wastewater investments in the province of Vizcaya, located in the Basque Country in Spain.

Ziele

The project will focus on water and wastewater investments across the province, to anticipate floods and droughts as a consequence of climate change, by increasing the resilience of bulk water and storm water collection systems. The wastewater investments will also ensure compliance with the environmental standards set by EU and national legislation.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 90 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 180 million

Umweltaspekte

Water supply components will optimise and improve resilience of water supply systems in different municipalities of the benefit area. Wastewater components are driven by a need to comply with the EU Urban Wastewater Treatment Directive 91/271/EEC and the Water Framework Directive 2000/60/EC. The project will have a strong positive effect on the environment, contributing to pollution abatement by improving the quality of effluents discharged to surface waters. Project regulatory requirements (environmental impact assessment, strategic environmental assessment, Natura 2000) will be assessed during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Projektstatus

Unterzeichnet - 30/06/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Wasser, Abwasser