Suche starten De menü de ClientConnect

Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190842
Veröffentlichungsdatum: 11 Dezember 2024

Projektträger – zwischengeschaltetes Finanzinstitut

PANSTWOWE GOSPODARSTWO WODNE WODY POLSKIE

Ort

Beschreibung

The Structural Programme Loan will co-finance the flood protection and prevention programme in Poland.

Ziele

The operation supports the Polish national government in the implementing their flood prevention, climate change adaptation, risk management and disaster resilience schemes under Specific Objective 2.4 of the Polish Government's European Funds for Infrastructure Programme, Climate and Environment 2021-2027 (Program Fundusze Europejskie na Infrastrukture, Klimat, Srodowisko 2021-2027). These sectors are also fully in line with Policy Objective 2 of EU Regulation (EU) 2021/1058 on European Regional Development Fund (ERDF) and the Cohesion Fund (CF) for the 2021-2027 programming period.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 200 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 900 million

Umweltaspekte

The river restoration schemes are expected to contribute to the overall improvement of the biodiversity of the flora and fauna. The drought management schemes are also expected to have a long term positive impact in terms of improving water resources availability. In general, it is foreseen that there will be temporary and reversible negative impacts during the implementation (construction) of the schemes. In case there are long term negative impacts, mitigation measures, as required by the competent environmental authorities, will be implemented. The project is expected to improve the adaptive capacity of the flood protection system across Poland against physical risks arising from climate change, primarily in the form of flood risk reduction and avoided flood damage. The Promoter will be required to act according to the provisions of the relevant EU Directives including, but not limited to the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU. The Promoter will also be required to ensure compliance of the project with the Water Framework Directive (2000/60/EC).

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU where applicable and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and/or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 12/03/2025

Milestone
In Prüfung
Genehmigt
Unterzeichnet
5 Februar 2025
12 März 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Wasser, Abwasser