Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20220374
    Veröffentlichungsdatum: 4 Juli 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    SJ AB

    Ort

    Beschreibung

    The project comprises the acquisition of 25 electric high-speed trainsets equipped to operate in Sweden, Norway and Denmark.

    Ziele

    The trainsets procured will be equipped to operate in Sweden, Norway and Denmark, and will predominantly be used to provide commercial long distance rail services connecting Stockholm and Gothenburg with other major cities in Sweden and the Nordics. Traffic operations are planned on the routes Stockholm-Gothenburg, Stockholm-Malmö-Copenhagen, Stockholm-Sundsvall-Umeå, Stockholm-Karlstad-Oslo, Gothenburg-Malmö-Copenhagen mainly on the TEN-T network.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    SEK 3500 million (EUR 296 million)

    Gesamtkosten (voraussichtlicher Betrag)

    SEK 7950 million (EUR 672 million)

    Umweltaspekte

    The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to expand their modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal. The project is expected to contribute to Climate Action and Environmental Sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation and pollution prevention.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 13/12/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    16 August 2023
    13 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Schweden Verkehr