    Referenz: 20230721
    Veröffentlichungsdatum: 11 März 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    REGION NOUVELLE-AQUITAINE,REGION OCCITANIE

    Ort

    Beschreibung

    The project consists of the acquisition of new rolling stock and modernisation of existing rolling stock for regional passenger services in the Nouvelle Aquitaine and Occitanie Regions in France.

    Additionality and Impact

    The project consists of the acquisition of new and modernisation of existing rolling stock to be

    used for rail services in the regions Nouvelle Aquitaine and Occitanie. The new and modernised

    rolling stock will contribute to increasing the rail offer and quality of rail services offered in the

    regions, reducing the journey time, promoting more efficient operation, reducing maintenance

    costs, lowering energy consumption and increasing the level of comfort for passengers. Indirectly,

    by improving services, the project will help railways compete with other modes, particularly private

    vehicles, so as to maintain or improve its modal share. Shifting passenger flows from other modes

    to rail may result in reduced vehicle operation costs, safety and environmental benefits.


    The project will facilitate access to rolling stock by various rail operators and consequently

    facilitate the competition for public service contracts and the liberalisation of rail services in line

    with the provisions of Regulation 1370/2007 and the 4th railway package. The project is located

    in an EIB cohesion regions, thus improving their accessibility and the mobility of their population.

    Thereby the project will support the strengthening of the EU's economic, social and territorial

    cohesion.


    EIB's loan plays an important role in securing a competitive overall financing of the operation,

    sending a positive signal to commercial co-lenders and contributing to the robustness of the

    business case. It reduces the borrower's funding cost and provides a stable long-term funding base."

    Ziele

    The aim is to improve the overall quality of the rolling stock fleet in the two Regions and introduce some innovative technologies (hydrogen) in order to replace diesel traction. This, in addition to the benefits stemming from the modal shift, will reduce the specific energy consumption of the rolling stock fleet itself. The project implementation arrangements will be further appraised.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 450 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 904 million

    Umweltaspekte

    The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. In addition, the arrangements for the scrapping of the replaced stock, if any, will be checked during appraisal.

    Auftragsvergabe

    The promoter has to ensure that contracts for implementation of the project have been/will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. In the case of the new trainsets, the rolling stock is being procured under two existing framework contracts, valid until October 2023 and August 2025, for which the contract and award notices were published in the OJEU (2007/S 247-302465, 2008/S 134 18028, 2009/S 221-317680 and 2010/S 59-087369). These framework contracts were procured in accordance with the relevant EU legislation applicable at the time: Directive 2004/17/EC, as well as Directive 92/13/EEC.

    Projektstatus

    Unterzeichnet - 13/06/2024

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    9 April 2024
    13 Juni 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Verkehr