Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20040360
    Veröffentlichungsdatum: 16 Dezember 2005

    Projektträger – zwischengeschaltetes Finanzinstitut

    DG Khan is one of the largest cement producer in Pakistan and belongs to the Nishat Group, a leading domestic industrial group with interests in the textile, insurance, manufacturing and banking sector.

    Ort

    Beschreibung

    The project concerns the construction and operation of a cement plant on a greenfield site, next to the raw materials deposit, and dedicated to the supply of the national market. It will have an annual capacity of some 2.5 Mt of cement.

    Ziele

    The local production of cement will valorise domestic raw material (like limestone and clay), and contribute directly to the industrial development and the economic diversification of a particularly poor rural region. An increase in cement production capacity should assist Pakistan to maintain a low level of cement prices, essential for the development of its infrastructure and of affordable residential housing projects and the reconstruction following the earthquake of October 2005. The project is also consistent with the poverty alleviation and infrastructure development priorities of EU development cooperation with Pakistan, which is the third largest recipient of EU aid in Asia.

    Kommentar(e)

    Manufacturing.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 35 million

    Gesamtkosten (voraussichtlicher Betrag)

    Project cost is estimated at about EUR 170 million, without working capital and interest during construction.

    Umweltaspekte

    An EIA has been performed by an independant consultant. The plant is designed with state-of-the art cement technology, which will reduce both energy consumption and atmospheric emissions levels, in line with usual international standards. The existing plant of the promoter is ISO 14001 certified.

    Auftragsvergabe

    Private sector project outside EU, for which EIB guidelines will apply, with fair and transparent procurement procedures, ensuring an appropriate selection of works goods and services, with an appropriate quality, at competitive price and in an a timely manner.

    Projektstatus

    Unterzeichnet - 2/04/2006

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Pakistan Industrie