Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20090635
Veröffentlichungsdatum: 11 Mai 2012

Projektträger – zwischengeschaltetes Finanzinstitut

This is a public sector operation. The loan will be signed by the Council for Development and Reconstruction, acting on behalf of the Government of Lebanon.

Ort

Beschreibung

Rehabilitation and widening to three lanes plus a service lane of the dual carriageway section of the A1 (which connects Beirut to the second largest city of Lebanon, Tripoli) between Nahr-El-Kalb and Tabarja, some 10.3 km long.

The project also entails the construction of two other major interchanges in Beirut (Galerie Semaan and El-Mawared).

Ziele

The proposed rehabilitation and widening project would increase the capacity of the corridor that connects Beirut to Tripoli and the population of the Metn villages, towards Kesrwan, Jbeil and surroundings, with the urban areas and infrastructure of the capital.

Kommentar(e)

This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 75 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 150 million

Umweltaspekte

If the project was located in the EU, it would fall under Annex II of the Directive 2011/92/EU since it is a widening to 2x3 plus one extra service lane some 10.3 km long. The intersections, depending on the area of land take and/or whether they lie on an expressway/motorway, may be Annex I. Notwithstanding the promoter has advised that the project was screened and an Environmental Impact Assessment has been done. The environmental and social procedures will be reviewed during the project appraisal. Clarity would also be sought on whether land take involves involuntary resettlement and the need to develop a resettlement action plan in accordance with the Bank's standards and whether any protected natural habitats are impacted by the project.

Auftragsvergabe

The Bank will require that the promoter implements the project in accordance with EIB procurement guidelines. The contracts for design and civil works will be procured through the Lebanese Council for Development and Reconstruction (CDR).

Projektstatus

Unterzeichnet - 21/12/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Libanon Verkehr