Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230396
    Veröffentlichungsdatum: 12 Juli 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    SYTRAL MOBILITES

    Ort

    Beschreibung

    This is the first allocation under the framework loan 2021-0107 LYON TRANSPORTS URBAINS 2026. It includes investments aimed at increasing capacity and improving the quality of service on the metro and tram networks in Lyon, particularly for those lines experiencing high levels of saturation. The components included in the allocation are following: the upgrade of metro line B to a fully automated metro system, including the renewal of the signalling system and the purchase of 28 new trains; the renewal of 26 existing metro trains dedicated to metro line A to extend their economic life; the renewal and upgrade of four metro stations on line A; a new traffic control centre for the metro network; the purchase of 35 trams of 43 metres and the upgrade of the tram infrastructure of lines T1 and T2 to make it compatible with the operation of longer trams and the renewal and upgrade of the ticketing system of the whole urban public transport network.

    Ziele

    The operation is expected to contribute to the promoter's strategic objectives for sustainable urban mobility, the energy transition and climate change mitigation, as set out in its urban transport plan and the Grand Lyon energy and climate plan. The operation is expected to help achieve the objectives of the urban transport plan, which aims to reduce the modal share of passenger cars from 44% to 35% by 2030 in favour of non-motorised and public transport, and the goals of the climate and energy plan, which aims to reduce CO2 emissions by 43% compared to 2000. The operation is therefore expected to provide economic benefits with an improvement in the efficiency and quality of public transport services.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 384 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 793 million

    Umweltaspekte

    The components included in the allocation concern mainly the renewal or upgrade of transport equipment and rolling stock that do not fall in the scope of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU. Few adaptations to the existing infrastructure such as the tram depot and streets are also foreseen. Those components have been screened-out by the competent authority due to the nature and the location of the investments. The competent authority in the screen-out decision confirms that the components are not expected to have impacts on nature conservation areas or protected species according to the provisions of the Habitats and Birds Directives92/43/EEC and 2009/147/EC respectively.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, in particular Directive 2014/23/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Verkehr